Case Studies

Oops! No Case Studies were found in this industry
Waste Management

The works comprised the installation of 12,500m2 of a Geosynthetic capping layer to an operation landfill site to allow the site to be progressively restored. The capping …

Read More
Remediation

Turnover of the entire site to a depth of 3m and the removal of relic foundations, hard obstructions, contaminated material & unsuitable material. Elevated levels of hydrocarbon …

Read More
Waste Management

The works comprised the installation of a steel pedestrian canopy to the upper area of the site together with a new remote lighting system, road widening, resurfacing …

Read More
Demolition

Controlled demolition of a redundant steel framed building on a live HWRC site in Staffordshire. The demolition was carefully planned to commence mid-afternoon on a Friday and …

Read More
Remediation

The creation of an engineered building plateau within a former sand pit. A cut to fill earthworks project involving the displacement of 66,000m3 of sands & gravels, …

Read More
Groundwork

4280m of 4 way ducting in field locations on the outskirts of Wrexham and 2520m of 6 way ducting in highway locations including 3 trunk road crossings. …

Read More
Remediation

The creation of an engineered building plateau across a former un-licenced landfill including surface tipped construction waste arisings; Bulk excavation of approximately 35,000m3 of contaminated soil which …

Read More
Drainage

The installation of 6000m metres of ducting across fields and in highways. Site enabling works involving 2200 mtrs of access roads across agricultural land and thrust and …

Read More
Drainage

The construction of a 5200m3 storm water retention harvesting system beneath the car park of a new office complex and business centre. Due to restraints posed by …

Read More
Groundwork

Baddesley Colliery Infrastructure – Park Top Limited 392m surfaced access road 7.2m wide with traffic holding bays Road restraint systems – trief kerbs and impact resistant barriers …

Read More
Renewables

DXI project managed the decommissioning of redundant six pack bases prior to reinstating the harbour wall and the block paved promenade. Existing drainage systems were investigated for …

Read More
Remediation

The creation of an engineered building plateau within an existing colliery spoil tip consisting of: Burnt shale Cohesive soils Granular material Within the footprint of the site, …

Read More
Groundwork

DXI have completed numerous reinforced concrete structures including: Concrete terracing for stadiums Sweeper bays in operational HWRC facilities Wheel wash pits in operational logistics depots Push wall …

Read More
Remediation

Re-location of the existing compost pods to a temporary constructed HDPE lined composting pad. Blasting of 22,000m3 of rock on three faces within a redundant quarry and …

Read More
Renewables

Investigate the presence of two redundant mineshafts in the footprint of a large proposed housing development and if found, to provide a concrete cap of sufficient bearing …

Read More
Groundwork

DXI successfully undertake numerous ground works projects throughout the UK. We are well versed in delivering ; Foundations R.C. slabs Retaining walls Drainage Service installations Kerbing, paving …

Read More
Drainage

DXI have successfully delivered numerous flood alleviation projects including those requiring: Stone filled gabion baskets Compacted clay core bunds River bank protection including willow faggots A right …

Read More
Drainage

DXI have successfully delivered numerous roads and sewers projects including the installation of large diameter attenuation systems. DXI are experienced in deep drainage installations having gained valuable Industry …

Read More
Demolition

Project Management of redundant jetty, reinforced concrete bunker and conveyor system in tidal conditions. Successfully completed within the constraints of a Marine Licence and exacting conditions imposed …

Read More
Drainage

The construction of a 5800m3 attenuation tank wrapped in 1mm LLDPE and cited within a public open space. The tank was connected to the existing surface water …

Read More